
|

|
• Proactive Repair of Surface Water Infrastructure |
• Protect Streets and Above Ground Facilities |
| • Protect Habitat and Environment |
|
Project Overview: This project will address severe erosion over a steep slope caused by a perched storm water outfall located above the Heronfield Wetlands at the corner of NE 120th Street and 110th Avenue NE. The proposed work will restore the eroded hill side with structurally stable fill material and extend the stormwater outfall to the bottom of the slope.
What to Expect: Impacts to the wetland and/or wetland buffer, if any, will be mitigated. At this time we do not expect any significant traffic impacts.
Timeline: Construction is anticipated to begin late August 2010, and be complete mid October 2010. | |
|
|
Caring for your infrastructure to keep Kirkland healthy, safe and vibrant.