Project Overview: This project will address severe erosion over a steep slope caused by a perched storm water outfall located above the Heronfield Wetlands at the corner of NE 120th Street and 110th Avenue NE. The proposed work will restore the eroded hill side with structurally stable fill material and extend the stormwater outfall to the bottom of the slope.
What to Expect: Impacts to the wetland and/or wetland buffer, if any, will be mitigated. At this time we do not expect any significant traffic impacts.
Timeline: This project will be in design through Spring 2010, and likely go to construction Summer 2010. | |
|
|